Supply and installation of a 1500kVA Standby generator system. Musgrave Generators Ltd were chosen for the design and installation of a new 1500kVA containerised generator. The new generator was designed to integrate with the two existing generators, and to provide a N+1 system.
Musgrave worked with the consultant to provide a suitable solution, and a bespoke package was built to meet HTM guidelines, and to satisfy the requirements of the Trust.
In addition, Musgraves were the main contractor and the turnkey project included civils works and the complete electrical installation including modification to the existing generator control systems and main LV switch board.
The project was successfully delivered on time and within budget.